Skip to main content
WhatsApp

Bring the essential-load list

For a home or business in Vizianagaram district, list appliances that must continue during an outage, operating hours and which loads start together. Share connection details and any existing solar or inverter information.

A few backed-up circuits and the entire property are different scopes. ACs, pumps and motors need startup and simultaneous-load checks before a configuration is proposed.

Design solar and storage together

Specify PV capacity, inverter power and stored energy separately. Ask which circuits are backed up, how transfer/isolation works, supported charging sources and operating limits.

PuREPower may be a component of a supported design; Prime Green Energies is the service provider, not its manufacturer. Existing-system retrofit acceptance follows compatibility review.

Arrange a configuration assessment

Agree a visit, travel where relevant and electrical access through the Vizianagaram team. Runtime and equipment selection follow load/site review, not a district-wide standard package.

Record commissioning, warranty and labour responsibilities before purchase.

Service and district information

Hybrid solar across Andhra Pradesh covers the wider offer. The Vizianagaram district directory covers locations and visit arrangements.

For this site, confirm the equipment scope, travel, taxes, support and any application work in the written quote. Compare quotation inputs.

Discuss your project

Call +91 77023 23749

Questions before booking

What does five-year support cover?

Five years of free labour and technician visits. Parts, replacements and manufacturer warranties are separate; confirm the applicable scope and exclusions in your quotation.

How is battery backup duration decided?

List simultaneous essential loads, starting power and required hours. Usable battery energy, losses, settings and equipment limits determine the design. PV kW, inverter kW/kVA and battery kWh are different quantities.

Can a battery be added to an existing solar installation?

Compatibility and retrofit acceptance need assessment before equipment is purchased. Share inverter, wiring and proposed load details; do not assume every installation supports backup.

Continue planning

Sources