Hybrid solar and battery backup
Request an assessment
Plan generation and essential-load backup
Prime Green Energies assesses solar-plus-storage requirements for homes and businesses across Andhra Pradesh. Start with electricity use, essential circuits, simultaneous loads and the hours of backup needed.
A battery is not a guarantee that every appliance will run during an outage. The design must define inverter power, usable storage, compatible charging sources, transfer/isolation and protected circuits.
Specify power, energy and integration separately
PV capacity in kW, inverter power in kW/kVA and battery energy in kWh describe different parts of the system. Include starting loads from motors or compressors, space and electrical access in the assessment.
For an existing installation, provide equipment models and wiring details. Retrofit compatibility and acceptance are confirmed before purchase; a generic battery package should not be assumed compatible.
Compare the written configuration
Ask for supported equipment combinations, backed-up circuits, operating limits, commissioning tests and the allocation of equipment/labour service responsibilities. Runtime depends on the agreed load profile and operating conditions.
PuREPower may be one equipment option. Prime Green Energies provides the service and installation scope; manufacturer specifications and warranties remain separate.
Andhra Pradesh service coverage
Based in Vizianagaram, Prime Green Energies accepts enquiries across Andhra Pradesh. Confirm the site's survey, travel and support arrangements before booking.
Discuss your project
Service questions
Will rooftop solar run during a power cut?
A conventional on-grid inverter shuts down when the grid fails. Backup needs compatible equipment, storage, transfer/protection arrangements and circuits designed for that purpose.
What does five-year support cover?
Five years of free labour and technician visits. Parts, replacements and manufacturer warranties are separate; confirm the applicable scope and exclusions in your quotation.
How is battery backup duration decided?
List simultaneous essential loads, starting power and required hours. Usable battery energy, losses, settings and equipment limits determine the design. PV kW, inverter kW/kVA and battery kWh are different quantities.
When can a survey or installation happen?
Agree timing after the locality, access, scope and equipment needs are reviewed. Approvals, site readiness and utility procedures can affect the sequence.
Do you serve places outside the four priority districts?
Prime Green Energies offers solar services across Andhra Pradesh from its Vizianagaram base. Share the district and locality to confirm scope, survey, travel and support arrangements.
Does residential subsidy apply to every solar project?
Eligibility, equipment and application conditions need checking through the current official process. Do not apply residential subsidy assumptions to a commercial project or a standalone battery purchase.
Can a battery be added to an existing solar installation?
Compatibility and retrofit acceptance need assessment before equipment is purchased. Share inverter, wiring and proposed load details; do not assume every installation supports backup.
