Skip to main content
WhatsApp

Home solar in Andhra Pradesh

Start with the electricity bill, usable roof and loads before choosing a system.

Residential rooftop solar modules

Check the property first

Review recent electricity use, connection phase, sanctioned load, roof access and shade. Tell us whether your priority is reducing grid consumption, essential-load backup or both.

Confirm the local arrangements

Based in Vizianagaram, we accept residential enquiries across Andhra Pradesh. Share your locality. Survey availability, travel, installation scope and support arrangements need confirmation for the property before a visit or quotation.

Illustrate a system size

Illustrative capacity

No calculation yet.

The starting values of ₹8/kWh and 1,400 kWh per kW per year are editable examples, not a local tariff or generation forecast. Bill ÷ energy tariff × 12 ÷ annual generation gives the capacity shown.

Fixed charges and taxes can distort a bill-based estimate. Use actual billed kWh for the assessment. Roof shade, connection limits, seasonal usage and daytime consumption still need review. This does not size batteries or predict savings.

Representative inspection of a solar panel clamp and cable route

From bill review to handover

  1. Review

    Discuss usage, the property, connection details and backup priorities.

  2. Survey and scope

    Confirm survey arrangements, then check roof conditions and electrical work needed.

  3. Compare the quotation

    Review equipment, mounting, protection, labour, charges, exclusions and payment stages.

  4. Commission and hand over

    Agree testing, monitoring, documents and product/labour support responsibilities in the written scope.

Solar during a power cut

A conventional on-grid system normally shuts down when the grid fails. A compatible backup configuration needs its own load, storage and protection assessment. Compare system types.

Support in the quotation

Ask which equipment warranties, labour commitments, exclusions and service charges apply. Paid maintenance or AMC should be described separately from any installation support.

Discuss your roof and electricity use

Request an assessment

Labour, equipment and paid service

Five years of free labour and technician visits. Parts, replacements and manufacturer warranties are separate; confirm the applicable scope and exclusions in your quotation.

Paid AMC has a separate scope, inspection schedule, eligibility, charges and exclusions. Confirm each responsibility in the proposal.

Residential questions

What determines the installed solar price?

Capacity, equipment, structure, cable routes, protection, labour, transport, taxes and site-specific work determine the quote. Request gross cost, exclusions and payment stages in writing; confirm subsidy separately.

Will rooftop solar run during a power cut?

A conventional on-grid inverter shuts down when the grid fails. Backup needs compatible equipment, storage, transfer/protection arrangements and circuits designed for that purpose.

Can I choose 3, 5 or 10 kW from my bill alone?

Seasonal energy use, usable roof, shade, connection limits, daytime consumption and applicable export rules still need review. A capacity label does not define the installed package.

What does five-year support cover?

Five years of free labour and technician visits. Parts, replacements and manufacturer warranties are separate; confirm the applicable scope and exclusions in your quotation.

When can a survey or installation happen?

Agree timing after the locality, access, scope and equipment needs are reviewed. Approvals, site readiness and utility procedures can affect the sequence.

Do you serve places outside the four priority districts?

Prime Green Energies offers solar services across Andhra Pradesh from its Vizianagaram base. Share the district and locality to confirm scope, survey, travel and support arrangements.

Does residential subsidy apply to every solar project?

Eligibility, equipment and application conditions need checking through the current official process. Do not apply residential subsidy assumptions to a commercial project or a standalone battery purchase.

Request a home solar assessment

Call +91 77023 23749