Skip to main content
WhatsApp

Prepare property information before a visit

Include the town or village within Srikakulam district and whether this is a house or shared building. Share consumption and roof/access information during the conversation so the team can define the assessment before travel.

If this is Srikakulam city, say so. City and district enquiries use the same contact team but need the actual locality to arrange a visit.

Separate a new installation from existing-system work

For a new system, identify roof ownership, connection, usage and backup needs. For an existing system, add equipment models, commissioning age when known and the reason for the visit.

A performance issue, cleaning request and new installation are different jobs. Use maintenance enquiries for inspection; eligibility, charges and replacement parts need a separate scope.

Confirm quotation and travel terms

Agree availability, travel charges and access before booking through the Vizianagaram-based team. Compare installation, metering coordination, taxes, nonstandard work and handover rather than a per-kW figure alone.

Equipment warranty, installation labour support and paid AMC have distinct responsibilities. A district response-time guarantee is not implied by accepting an enquiry.

Service and district information

Residential solar across Andhra Pradesh covers the wider offer. The Srikakulam district directory covers locations and visit arrangements.

For this site, confirm the equipment scope, travel, taxes, support and any application work in the written quote. Compare quotation inputs.

Discuss your project

Call +91 77023 23749

Questions before booking

Can I choose 3, 5 or 10 kW from my bill alone?

Seasonal energy use, usable roof, shade, connection limits, daytime consumption and applicable export rules still need review. A capacity label does not define the installed package.

What does five-year support cover?

Five years of free labour and technician visits. Parts, replacements and manufacturer warranties are separate; confirm the applicable scope and exclusions in your quotation.

When can a survey or installation happen?

Agree timing after the locality, access, scope and equipment needs are reviewed. Approvals, site readiness and utility procedures can affect the sequence.

Continue planning

Sources